Locomotive by Anne Cram – Progress 6

I’ve been working all over the bottom of the canvas but haven’t finished any section completely. I started below the red cab and filled in the two sections of black and gold. Then I completed all the red and gold Kreinik parts of the wheels. I’ve started stitching one of the wheels, but I’m not sure I like it yet. I did complete the section just to the right of the wheels – all the machine parts done in black, white, and silver Kreinik.

Then, for a change of pace, I switched to the front of the locomotive. All the gold sections are being stitched in three shades of gold Silk Lame Braid. The front is completed but it’s hard to see the engine number 1857. I may need to outline the numbers so they are more visible.

And this is where I’m going to stop for now. This is a large piece on stretcher bars so I’ll put it away for a little while and then get back to it in a few months. Here’s how the entire piece looks right now.

 

Advertisements

3 responses to “Locomotive by Anne Cram – Progress 6

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s