3D Train Station by Rebecca Wood – Progress 8

The front of the train station is now complete except for the greenery (and one door handle). I wanted to have this piece done by the end of the month, but that is not going to happen.

Station-8

I also left the section on the left in the photo so you could see what I still have to do. The left side is about 5 inches across and the regular stitching won’t take too long, so it should be done by the end of the month. Then it will be time to stitch all the bows with Flair, and all the garland, trees, and wreaths with overdyed greens.

Advertisements

3 responses to “3D Train Station by Rebecca Wood – Progress 8

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s