Wysocki’s Riverbank Train Station – Progress 7

I’ve been alternating between stitching the train and getting some of the top stitching done this past week. The fence on the left side has been stitched, the Barber poll and sign are done, the wood planking along the front of the stores is almost done and the bookstore is complete. The train engine and tender are now complete as well.

Riverbank-7

I hope to get this completely finished by this time next week, so I’ll have to put in a little extra time each day. There is a passenger car and part of a second one to stitch, the top stitching for the ticket office, the stairs and a few other little details. Then I can scroll back up to the top. I’ll have some stitching to do on the windows, two signs, and then the small branches and French Knots for the two large trees.

Advertisements

5 responses to “Wysocki’s Riverbank Train Station – Progress 7

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s